June 23, 2020
Our drilling contractor EDIT PLC completed and capped the Kefita proprietary water well which will serve the building. The well extends to 272.10 meters deep. Excellent Aquifers have been encountered and the well configuration is designed to maximise flows. All works have been overseen by our consultants, Eclipse Engineering PLC.